Bigbund(Shanghai)Construction Machinery Co., Ltd.
Tel: 0086-21-35359336  35359337
Hot Search:
HDD
Home > Products > Drilling and Pipeline machine > HDD
HDD XZ200
HDD XZ200
0086-21-35359336  35359337

1. The two-speed power head runs at low speed when drilling and pulling back to ensure smooth construction; when unloading drill pipes and unloading back and forth, the power head can accelerate sliding to reduce auxiliary time and improve work efficiency.


2. The rubber track has the least impact on roads, lawns and scenic spots.


3. The floating vise using our company's patented technology can effectively prolong the service life of the drill pipe.


4. The operating platform can be rotated to increase the field of view of the operator, reduce operator fatigue, and make the operation of the drilling machine easier and more comfortable.


5. The design of the engine cover is reasonable, and it is simple and convenient to maintain the engine and replace the filter element of the hydraulic system.

DescriptionUnitParameter value
EngineManufacturers
Dongfeng Cummins
China IIIModel
QSB5.9-C150
Rated PowerkW /(r/min)113 / 2200
China IIModel
6BTAA5.9-C150
Rated PowerkW /(r/min)112/ 2200
China IIIModel
QSB4.5-C160
EU Stage IIIARated PowerkW /(r/min)119/2200
Thrust-PullType
Pinion and rack drive
Max thrust-pull forcekN225/225
Max thrust-pull speedm/min26
RotationType
two motor
TorqueN·m6350
Max spindle speedr/min160
Loader Crance//
Max inclination angle°22
PipeDiameter × Lengthmm×mmΦ60×3000
Mud pumpMax Flow rateL/min250
Max pressureMPa8
Weightkg8500