Bigbund(Shanghai)Construction Machinery Co., Ltd.
Tel: 0086-21-35359336  35359337
Hot Search:
HDD
Home > Products > Drilling and Pipeline machine > HDD
HDD XZ180
HDD XZ180
0086-21-35359336  35359337

1, double speed power head, low speed operation during drilling and back towing, to ensure smooth construction; When connecting and unloading drill pipe with no load, power head can accelerate sliding, reduce auxiliary time and improve work efficiency.


2. Rubber tracks have minimal impact on roads, lawns and scenic spots.


3. The floating vise with our patented technology can effectively extend the service life of drill pipe.


4. Rotating operation platform can increase the operator's field of vision, reduce operator fatigue, and make the operation of drilling rig more simple and comfortable.


5, drill pipe automatic loading and unloading device can improve the work efficiency, reduce the labor intensity of the operator, reduce the number of construction.


6, hydraulic drive, oil cylinder and low speed large torque motor control anchor drilling and lifting, easy to operate.


7, the engine hood design is reasonable, engine maintenance and hydraulic system replacement filter element, simple and convenient.

DescriptionUnitParameter value
EngineManufacturers
Dongfeng Cummins
China IIIModel
QSB5.9-C150
Rated PowerkW /(r/min)113 / 2200
China IIModel
6BTAA5.9-C150
Rated PowerkW /(r/min)112/ 2200
China IIIModel
QSB4.5-C160
EU Stage IIIARated PowerkW /(r/min)119/2200
Thrust-PullType
Pinion and rack drive
Max thrust-pull forcekN225/225
Max thrust-pull speedm/min26
RotationType
two motor
TorqueN·m6350
Max spindle speedr/min160
Loader Crance//
Max inclination angle°22
PipeDiameter × Lengthmm×mmΦ60×3000
Mud pumpMax Flow rateL/min250
Max pressureMPa8
Weightkg8500